Project 026 · Officer VIC
Site Cut & Base Construction
Excavation / Levelling / Base

Brief
Full rear-yard cut and fill to create two usable terraces before landscape construction.
Challenge
Spoil removal through a single 3m access with an established tree to protect.
Result
Two level terraces, compacted base ready for retaining and paving.
No job photos attached yet.