Skip to content
ABN 20 395 282 011SPEC AS-4419SEASON 2025/26SOUTH-EAST VICTORIAOFF THE TOOLS

Project 029 · Beaconsfield VIC

Shed Slab & Path Network

Concreting / Paths / Preparation

Fresh concrete slab being power floated with formwork and starter bars in place

Brief

A shed slab plus connecting paths around three sides of the house.

Challenge

Pour sequenced around a single access gate and a same-day finish window.

Result

Slab and paths poured in one day, joints aligned across both elements.

No job photos attached yet.